Twyford Bridge
TILT coordinated the design of the replacement footbridge for the Environment Agency, including;
- design of a retaining wall ramp; 
- design management of the suppliers; and 
- assessment of the slope stability of the river embankment. 
TILT managed the project risk to provide assurance against erosion in a cost effective manner.
 
                        